City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
anticipated over a period of nine months. Meetings shall be approximately one hour in duration <br />and shall be attended by an average of three CONSULTANT team members, including two of <br />the CONSULTANT's project management team and/or project engineering staff and one other <br />CONSULTANT discipline specialists. <br />Deliverable(s) <br />• Meeting notes for all CONSULTANT and CITY meetings <br />Subtask 1.4 Quality Assurance <br />The CONSULTANT shall provide quality assurance/quality control (QA/QC) for all design <br />work in accordance with the CONSULTANT's QA/QC standards. <br />Deliverable(s) <br />• QA/QC documentation for all design work will be made available to the CITY upon <br />request. <br />Subtask 1.5 Project Close Out <br />Upon completion of the project, the CONSULTANT shall archive project work products in <br />accordance with its work product policy on retention policy in effect at that time and provide the <br />CITY electronic and hard copies of all deliverables and supporting documents. <br />Deliverable(s) <br />• Monthly progress report, with earned value, and invoice (one copy) <br />• Updated project schedules if required (one copy) <br />• Updated contract forms and certifications <br />• Meeting notes for all CONSULTANT and CITY meetings <br />• QA/QC documentation for all design work will be made available to the CITY upon request <br />TASK 2.0 DESIGN SUBMITTAL AND REVIEW <br />This task provides for the quality control (QC) of each submittal package, compiling the PS&E <br />submittals, and reviewing and responding to the review comments received from the CITY. <br />Subtask 2.1 Thirty Percent Design Submittal <br />Quality Control <br />The CONSULTANT shall provide QC reviews for all design work prior to the 30 percent <br />submittal to the CITY if requested. <br />Compile Submittals <br />The CONSULTANT shall coordinate with all subconsultants and compile the PS&E for each of <br />the PS&E tasks. <br />Comment Review Meeting <br />The CONSULTANT will attend a one (1) hour comment resolution meeting with the CITY to go <br />through the CITY's comments, and to come to a tentative agreement on them. <br />Comment Resolution <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 20125 <br />Page 2 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.