• The CITY will prepare the final contract documents, including compiling all the <br />specifications and drawings. <br />Deliverable(s) <br />• Special provision submittals at 90, 100 percent and Ad Ready level of completion <br />TASK 5.0 CONSTRUCTION COST ESTIMATE <br />The CONSULTANT shall prepare a list of bid items, conforming to the WSDOT standard item <br />table, for the project. Each bid item will have a description, measurement unit, and payment <br />description in the specifications. Quantities and unit prices will be estimated for every bid item. <br />Unit prices will be estimated from recent bid experience on similar projects, WSDOT unit bid <br />analysis, and/or the Means construction estimating manuals, as applicable. <br />In addition, the CONSULTANT shall prepare a quantity take -off binder of all bid items that <br />shows how each bid item was estimated, complete with sketches and calculations as necessary to <br />the limits of the items. <br />Assumptions(s) <br />• It is assumed that there will be four reviews of the engineer's construction cost estimate at <br />the 30, 60, 90, and 100 percent submittals. <br />Deliverable(s) <br />• Thirty (high level), 60, 90, and 100 percent, <br />estimates <br />• Engineer's construction cost estimate review comments <br />• A quantity take -off binder at the Ad Ready submittal if requested. <br />and Ad Ready engineer's construction cost <br />TASK 6.0 CONSTRUCTION SCHEDULE <br />The CONSULTANT will prepare a construction schedule for the project. The construction <br />schedule identifies major milestones and work activities for each phase of the project in <br />sufficient detail to develop the duration of construction to complete the contract work items. This <br />schedule will be refined as the design progresses. <br />It is assumed that there will be three reviews of the construction schedule at the 60, 90, and <br />100 percent submittals. <br />Deliverable(s) <br />• 60, 90, 100 percent, and Ad Ready construction schedules using Primavera or Microsoft <br />Project scheduling software <br />• Responses to Construction Schedule review comments <br />TASK 7.0 UTILITY COORDINATION <br />Subtask 7.1 Review Existing Utility Data <br />The CONSULTANT shall contact all utilities within the corridor to obtain and review available <br />as-builts and construction record drawings for the existing utilities. The CONSULTANT shall <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July an <br />Page 7 of 16 <br />