Laserfiche WebLink
Subtask 9.1 Survey Control <br />The CONSULTANT shall perform all survey control in accordance with the City of Tukwila <br />Public Works Department, Infrastructure Design and Construction Standards (2019). <br />Survey control plans must at a minimum describe all monuments, the geometry of, and <br />references used to establish the right-of-way, lines referencing the right-of-way, property lines, <br />easements, and any rights in real property shown. Survey control information must be shown <br />independently of other plan, design, or topographic information (on a separate sheet), and must <br />contain the surveyor's stamp, contact information, and the date. <br />Documentation/Notes <br />Monuments and <br />Monument/Control <br />Line <br />Right -of -Way <br />Limits <br />Presentation <br />• Horizontal Datum <br />• Survey Control <br />• Dimension <br />• 1"=50' Drawing <br />• Vertical Datum <br />Point Tables with <br />from <br />Scale <br />• Basis of Bearing <br />Point Number, <br />Monument <br />• Street Name <br />• Benchmarks <br />Northing, Easting, <br />Line <br />Labels <br />• Project Field <br />and Description <br />• Length, <br />• Monument Line <br />Notebooks <br />• Label Control <br />Radius, and <br />Station Labels <br />• Convergence Angle <br />Points in Drawing <br />Angle Delta <br />• Sheet Numbers <br />• Project Combined <br />• Monument <br />for Curves <br />Coordinated with <br />Grid Factor <br />Descriptions <br />Project Plan Set <br />• Scale Factor Basis <br />• Monument Line <br />• Reference Documents <br />Distance Bearing <br />(plats/record surveys) <br />• Monument Line <br />• Project Surveyor <br />• Equipment, Method <br />and Accordance with <br />Distance Radius <br />and Angle Delta <br />for Curves <br />WAC Accuracy <br />Standards <br />Deliverable(s) <br />The following deliverables are included in Task 9.1. <br />• The CONSULTANT shall provide 22- by 34 -inch stamped and signed survey control <br />plans on bond paper with the project's 30 percent design submittal. The <br />CONSULTANT shall provide an electronic PDF copy of the survey control plan with <br />the 30 percent design submittal using the CITY -provided project -specific title block. <br />Subtask 9.2 Topographic Surveying and Mapping <br />The CONSULTANT shall perform topographic surveying and mapping in the locations <br />identified in Attachment 1. Mapping limits will be Right -of -Way to Right -of -Way plus 10 feet <br />where possible. The entirety of parcels 7661600211, 7661600208, and 8733000070 will be <br />mapped. For these areas, full 3-D mapping will be completed. <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2c <br />Page 11 of 16 <br />