Laserfiche WebLink
• Building faces <br />• Garage entrances <br />• Door thresholds <br />• Retaining walls <br />• Railroad tracks <br />• Edge of Access Roads <br />• Trees <br />• Fences and fence posts <br />• Steps and walkways <br />• Driveway locations if located at back of sidewalk or behind curb <br />• At existing driveway locations, a sufficient number of survey shots shall be taken <br />within private property to establish grade of driveway transitions onto private <br />property. <br />Assumptions(s) <br />• The CITY will provide rights of entry on any private parcels where mapping is needed. <br />Subtask 9.3 Creation of Design Files <br />A survey base map file will be compiled in AutoCAD® Civil 3D® 2022 for the basis of design. <br />This file will show the site's existing condition and surface capable of displaying 1 -foot contours. <br />Verified ROW lines of record, dynamic notes, control, and other observations (prepared for <br />1 "=20' plans) will be included in this file to aid in the design going forward. <br />Deliverable(s) <br />The following deliverables are included in Task 9.2. <br />• Draft base map drawing (AutoCAD Civil 3D 2022), encompassing the survey limits, <br />containing all existing surveyed features. Graphical scale shall be 1"=20'. <br />• Final base map drawing (AutoCAD Civil 3D 2022), encompassing the survey limits, <br />containing all existing surveyed features. Graphical scale shall be 1"=20'. <br />• Integrated Land XML -compatible DTM. <br />• An AutoCAD Civil 3D 2022 XYZ point drawing file in PNEZD format (point <br />number, northing, easting, elevation, and description) <br />• Point cloud files provided in .imp and .rcp format <br />• Survey field notes <br />Subtask 9.4 Right -of -Way and Parcel Research, Title Analysis, Boundaries <br />1 Alliance Geomatics shall perform ROW research and determination of ROW boundaries <br />through the project. 1 Alliance Geomatics shall review and analyze title reports provided for the <br />project to determine property lines and resolve easements for up to 5 parcels. This effort is <br />primarily for the main alignment route. This task also includes research of public survey records <br />throughout the project, as well as research regarding survey control and controlling monuments <br />to be used throughout the project design and construction. <br />TASK 10.0 GEOTECHNICAL ENGINEERING (PANGEO) <br />PanGeo (SUBCONSULTANT) under a subconsultant agreement with the CONSULTANT, will <br />provide the scope included in Attachment 6. Permits and rights -of -entry provided by the CITY. <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July agg <br />Page 13 of 16 <br />