City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 11.0 DIRECTED SERVICES <br />This task is intended to cover project activities that are likely to be required, but for which the <br />scope and level of effort cannot accurately be defined. <br />Deliverable(s) <br />• The deliverables for this task are to be determined (TBD) if and when the additional <br />efforts are required <br />TASK 12.0 AD, BID, AND AWARD SERVICES <br />Subtask 12.1 Bid Advertisement Assistance <br />The CONSULTANT shall assist the CITY in preparing the contract bid documents for <br />advertising and getting them uploaded to an internet site of their choice for contractors to <br />download and review during the bid review process. It is assumed this assistance will be for a <br />two-week timeframe. <br />Subtask 12.2 Prepare Response to Bidder Inquiries <br />The CONSULTANT shall provide formal responses to comments received by the CITY during <br />the bid advertisement period. The responses to the comments will be submitted to the CITY for <br />further distribution and dissemination to the contract plan holders. It is assumed that the <br />CONSULTANT will provide up to thirty (30) formal responses. It is assumed there will be a <br />four-week bid period. <br />Assumptions(s) <br />• Assume thirty (30) responses will be required <br />Deliverable(s) <br />• Up to thirty (30) formal responses to bidder inquiries <br />Subtask 12.3 Prepare Addenda <br />The CONSULTANT shall prepare addendum packages to the contract bid documents as <br />requested by the CITY. It is assumed that the CONSULTANT will provide up to two (2) <br />addenda. It is assumed there will be a four-week bid period. <br />Assumptions(s) <br />• Assume two (2) addenda will be required <br />Deliverable(s) <br />• Up to two (2) addenda <br />Subtask 12.4 Prepare Conformed Final Contract Documents <br />After the bid process is complete, the CONSULTANT shall prepare the conformed final contract <br />documents, which will include any information from the Addendums that needs to be included in <br />the final contract documents. <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2Q <br />Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.