City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 3 - CONSULTANT FEE DETERMINATION <br />S 149TH ST TO S 150TH ST WATER MAIN REPLACEMENT <br />WSP Hours <br />7/18/2023 <br />WSP Hours <br />Page 2 of 5 <br />37 <br />Task <br />` <br />y <br />0' 0) <br />N R <br />.O c <br />as <br />N <br />t7 N <br />_ a) E <br />•> .O g <br />Uaw <br />N <br />y V .E <br />ca cu <br />7 .O2 <br />maw <br />R <br />N <br />y N <br />V .E <br />`2 <br />trim' <br />N <br />C <br />E <br />•> •E <br />Our <br />w <br />Cl.) W. <br />C D <br />OI <br />•y 0 <br />oU <br />ty7 <br />C7 -a d 1E <br />d G - <br />.O 0 5 2 <br />a0.20 <br />Totals <br />DSC <br />$ 98.25 1 <br />$ 74.79 1 <br />$102.42 1 <br />$ 78.61 1 <br />$ 45.56 1 <br />$ 53.47 1 <br />$ 46.56 <br />$ - <br />30% Construction Plans- <br />25 <br />- <br />- <br />90 <br />94 <br />- - <br />Sixty Percent Design Submittal <br />2.2 <br />2 <br />16 <br />- <br />- <br />49 <br />49- <br />- <br />116 <br />Written Responses to CITY 30% Comments <br />2 <br />4 <br />4 <br />2 <br />12 <br />60% Construction Plans- <br />12 <br />- <br />- <br />45 <br />47 <br />- - <br />104 <br />Ninety Percent Design Submittal <br />2.3 <br />2 <br />16 <br />- <br />- <br />49 <br />49- <br />- <br />116 <br />Written Responses to CITY 60% Comments <br />2 <br />4 <br />4 <br />2 <br />12 <br />90% Construction Plans- <br />12 <br />- <br />- <br />45 <br />47 <br />- - <br />104 <br />One Hundred Percent Design Submittal <br />2.4 <br />2 <br />13 <br />- <br />- <br />38 <br />37- <br />- <br />90 <br />Written Responses to CITY 90% Comments <br />2 <br />4 <br />4 <br />2 <br />12 <br />100% Construction Plans- <br />9 <br />- <br />- <br />34 <br />35 <br />- - <br />78 <br />Ad Ready Documents for Bidding <br />2.5 <br />2 <br />6 <br />- <br />- <br />12 <br />15- <br />- <br />35 <br />Written Responses to CITY 100% Comments <br />2 <br />2 <br />2 <br />2 <br />8 <br />Ad Ready Construction Plans- <br />4 <br />- <br />- <br />10 <br />13 <br />- - <br />TASK 3 - CIVIL DESIGN <br />3 <br />5 <br />30 <br />56 <br />24 <br />12 - <br />127 <br />Roadway Design <br />3.1 <br />15 <br />1 <br />2 <br />- <br />- <br />4 <br />8- <br />- <br />Proposed Roadway Layout <br />1 <br />2 <br />4 <br />8 <br />15 <br />ADA Curb Ramp Design <br />3.2 <br />4 <br />20 <br />- <br />- <br />36 <br />8 <br />12 - <br />80 <br />Curb Ramp Design (assume 2 ramps) <br />4 <br />4 <br />8 <br />16 <br />Draft MEF Documentation (assume 2 ramps) <br />2 <br />8 <br />16 <br />8 <br />34 <br />Final MEF Documentation <br />2 <br />8 <br />16 <br />4 <br />30 <br />Stormwater Pollution and Prevention Plan <br />3.3- <br />8 <br />- <br />- <br />16 <br />8 <br />- - <br />32 <br />Draft SWPPP at 60% <br />2 <br />4 <br />4 <br />10 <br />Written Responses to CITY 60% Comments <br />2 <br />4 <br />6 <br />Draft Final SWPPP at 100% <br />2 <br />4 <br />4 <br />10 <br />Written Responses to CITY 100% Comments <br />2 <br />4 <br />6 <br />Final SWPPP at Ad Ready <br />2 <br />4 <br />4 <br />10 <br />TASK 4 - CONSTRUCTION SPECIFICATIONS <br />4 <br />4 <br />27 <br />72 <br />7 - <br />110 <br />WSP Hours <br />Page 2 of 5 <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.