EXHIBIT A <br />SCOPE OF WORK FOR ENGINEERING SERVICES FOR <br />S 149TH ST TO S 150TH ST WATER MAIN REPLACEMENT PROJECT <br />PROJECT BACKGROUND AND OBJECTIVES <br />The South 149th Street to South 150th Street Water Main Replacement project is part of an <br />ongoing water system improvement effort by the City of Tukwila (CITY). This project is the <br />third and final water main replacement contract in the immediate vicinity of the Macadam Road <br />South main line. The objective of the project is to replace a leaking existing six-inch cast iron <br />water main pipe which traverses north/south between S 149th St and S 150th St through two <br />private properties. The CITY is also aiming to replace aging 6" Cast Iron mains in the east/west <br />direction from Macadam Rd S at the bottom of the hill and 57th Ave S at the top. The City <br />would prefer to remove the water, stormwater, and sewer utilities in the north/south run through <br />the two private properties and install new connections down the hill to Macadam Rd S through <br />the existing Southcenter Community Baptist Church parcel. However, if this option is not <br />feasible, replacement of the existing water main near its existing position would be acceptable. <br />See Attachment 1 for an exhibit of the proposed project improvements. <br />The scope of work for final engineering will include the development and evaluation of two <br />alternatives to a conceptual design level and some options for constructing the project. This <br />effort will culminate in the selection of a preferred alternative, which will be become part of the <br />final design as described below. <br />PROJECT ASSUMPTIONS <br />The following list is included to confirm the understanding between the CITY and the <br />CONSULTANT and will be used to guide the work. Additional assumptions are provided with <br />each specific project task. <br />• Throughout this scope of work, it is understood that the CITY will provide the <br />CONSULTANT with one set of consolidated review comments for each draft review <br />round. The CONSULTANT will respond to the comments and incorporate the agreed- <br />upon resolution into the final document(s). <br />• Design of the project will comply with the City of Tukwila Public Works Department, <br />Infrastructure Design and Construction Standards (2019). <br />• Stormwater design will comply with the King County Surface Water Design Manual <br />(2021), except as modified in Section 5.0.1 of the City of Tukwila Public Works <br />Department, Infrastructure Design and Construction Standards (2019). <br />• Utility relocation and reconstruction plans for power, gas, and communication purveyors <br />will be prepared by the respective utility if required. The CONSULTANT will <br />coordinate directly with the utility companies and the CITY. <br />• Effort has been included in this scope for the relocation of the stormwater and sewer lines <br />through the Southcenter Community Baptist Church property with the understanding this <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 20p <br />Page i of iii <br />