is the preferred alternative. Only the extension through the church property from the <br />west end of S149th St to the tie in at Macadam Rd S is included. <br />• The CITY will lead coordination efforts for any required permits. <br />• The CITY will provide rights -of -entry onto private lands prior to environmental <br />explorations, if required, and geotechnical investigations, including drilling. The <br />CONSULTANT will provide a list of private property access that will be required. The <br />CITY will be responsible for making all initial contact and subsequent arrangements, if <br />required, for rights -of -entry to private property. The CONSULTANT will subsequently <br />be responsible for notifying both the CITY and the property owner regarding the timing <br />of the work. The CONSULTANT will coordinate the right -of -entry needs from all <br />disciplines so that multiple right -of -entry requests are not requested from the same <br />property owner. <br />SCOPE OF WORK AND LEVEL OF EFFORT <br />To facilitate management of the project in an efficient manner, the scope of work for the final <br />design has been broken into the tasks listed below. <br />Task 1.0 <br />Task 2.0 <br />Task 3.0 <br />Task 4.0 <br />Task 5.0 <br />Task 6.0 <br />Task 7.0 <br />Task 8.0 <br />Task 9.0 <br />Task 10.0 <br />Task 11.0 <br />Task 12.0 <br />Task 13.0 <br />General Activities <br />Design Submittal and Review <br />Civil Design <br />Construction Specifications <br />Construction Cost Estimate <br />Construction Schedule <br />Utility Coordination <br />Right -of -Way Plans and Assistance <br />Surveying (ABC Surveyor) <br />Geotechnical Engineering (ABC Geotechnical) <br />Directed Services <br />Ad, Bid, and Award Services <br />Construction Support Services <br />The level of effort associated with providing these services is shown in Attachment 3. The <br />estimated level of effort is based upon the assumptions and task descriptions provided below. <br />Efforts to complete these tasks can vary from the effort assumed for the preparation of the level <br />of effort shown in Attachment 3. Some budget items may cost more and others may cost less. <br />The CONSULTANT shall monitor total costs expended under this agreement and shall notify the <br />CITY if funds need to be reallocated between tasks. <br />SCHEDULE (see attached schedule) <br />The target dates for completing all work are shown on the schedule included in Attachment 4. <br />These target dates assume that the notice to proceed (NTP) is provided on 30 June 2023. <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2090 <br />Page ii of iii <br />