Laserfiche WebLink
TABLE OF CONTENTS <br />DRAFT SCOPE OF WORK <br />S 149TH TO S 150TH ST WATER MAIN REPLACEMENT <br />SECTION PAGE <br />PROJECT BACKGROUND AND OBJECTIVES I <br />PROJECT ASSUMPTIONS I <br />SCOPE OF WORK AND LEVEL OF EFFORT II <br />SCHEDULE (SEE ATTACHED SCHEDULE) II <br />TASK 1.0 GENERAL ACTIVITIES 1 <br />TASK 2.0 DESIGN SUBMITTAL AND REVIEW 2 <br />TASK 3.0 CIVIL DESIGN 5 <br />TASK 4.0 CONSTRUCTION SPECIFICATIONS 6 <br />TASK 5.0 CONSTRUCTION COST ESTIMATE 7 <br />TASK 6.0 CONSTRUCTION SCHEDULE 7 <br />TASK 7.0 UTILITY COORDINATION 7 <br />TASK 8.0 RIGHT-OF-WAY PLANS AND ASSISTANCE 9 <br />TASK 9.0 SURVEYING (1 -ALLIANCE) 10 <br />TASK 10.0 GEOTECHNICAL ENGINEERING (PANGEO) 13 <br />TASK 11.0 DIRECTED SERVICES 14 <br />TASK 12.0 AD, BID, AND AWARD SERVICES 14 <br />TASK 13.0 CONSTRUCTION SUPPORT SERVICES 15 <br />FEE 15 <br />CLOSING 15 <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2003 <br />Page iii of iii <br />