City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2024-07-22 Item 2B - Agreement - Large Meter Water Replacement with Ferguson
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2024-07-22 Transportation and Infrastructure Services
>
TIS 2024-07-22 Item 2B - Agreement - Large Meter Water Replacement with Ferguson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:30:04 PM
Creation date
7/18/2024 3:18:03 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/22/24
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT: <br />COMMENT: <br />2023 to 2028 <br />Large Meter Water Replacement <br />Upgrade and replace the City's existing large water meters. <br />Project No. 92340101 <br />The new meters will enable easier and safer acces to the meters. A potential leak would also be detected much <br />quicker. <br />Project scheduled for 2023 through 2027. <br />New equipment will slightly reduce maintenance needs. <br />As most of the large water meters are within the CBD area, the construction will be phased out over several years <br />to minimize disruption. <br />FINANCIAL <br />(in $000's) <br />Through Estimated <br />2021 2022 2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />50 <br />50 <br />50 <br />50 <br />200 <br />Land(R/W) <br />0 <br />Const. Mgmt. <br />0 <br />Construction <br />100 <br />100 <br />100 <br />100 <br />100 <br />600 <br />1,100 <br />TOTAL EXPENSES <br />0 <br />0 <br />50 <br />150 <br />150 <br />150 <br />100 <br />100 <br />2,000 <br />1,300 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />0 <br />0 <br />50 <br />150 <br />150 <br />150 <br />100 <br />100 <br />600 <br />1,300 <br />TOTAL SOURCES <br />0 <br />0 <br />50 <br />150 <br />150 <br />150 <br />100 <br />100 <br />600 <br />1,300 <br />2023 - 2028 Capital Improvement Program <br />438 <br />
The URL can be used to link to this page
Your browser does not support the video tag.