City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2012-04-12 ITEM 4 - TUKWILA HOME2SUITES - STAFF REPORT
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2012-04-26 Planning Commission - Tukwila Home2Suites (Barghausen Consulting Engineers)
>
Planning 2012-04-12 ITEM 4 - TUKWILA HOME2SUITES - STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:06:10 PM
Creation date
4/20/2012 1:50:14 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
04/26/12
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. The site plan shall use lanc/scahing and builcing shapes to jorIn an aestheticallvhleasing ancr'he(lestr °ian scale <br />streetsealy. This shall inch0e, but not be linnlecl to faeilitating jve lestrian travel along the street, using <br />architecture aml lamiscaTrng to In ovOe a desirable transition f on7 streetscape to the builcing, amlj)rovi&ng an <br />integrated linkage fi °ornheclestr °ian MAI vehicular facilities to buikling entries. <br />Typically-, a pedestrian scale streetscape is created by locating a building at the back of sidewalk and providing <br />visual interest along the ground floor through features such as vvindovvs allowing pedestrians to look into the <br />building and architectural details. The north property line is approximately 2(_) feet from the right of s-,-as and the <br />railroad spur prevents sidewalk development. The odd shape of the parcel and the setbacks created by the railroad <br />spurs limit the ability to create a pedestrian scale streetscape or to facilitate pedestrian activity along Minkler <br />Boulevard. Further, ground floor guest suites iulubit the use of significant amounts of glazing along the ground <br />floor exterior walls. With these limitations, site improvements to meet the pedestrian streetscape requirement <br />include the following: <br />a) perimeter landscaping along Upland Drive and Minkler Boulevard; <br />b) a separated sidewalk with landscaping and street trees is created along Upland Drive; <br />c) pedestrian paths surround the building and connect with pedestrian crossings that lead to both the north and <br />south property lines and the exterior rosy of parking, and <br />d) concrete is proposed for the pedestrian crossings within the asphalt parking lot to better define and <br />highlight the crossings. <br />With the railroad spur between the property- line and Minkler Boulevard, frontage improvements along Minkler <br />swill need to be deferred. The City's Public Works Department swill require the applicant enter into a no- protest <br />local improvement district (LID) to defer improvements including sidewalks until the railroad spurs are removed. <br />The LID will allow the City to construct frontage improvements in the fixture and pass the costs to the applicant <br />through monthly assessments. This requires a vote of affected property owners and this property owner swill be <br />agreeing vote in favor (i.e. not to protest) the creation of the LID. Regardless of when a sidewalk may be <br />developed along Minkler Boulevard, phase II improvements will create a pedestrian path around the entire site <br />within the railroad easements. <br />cr'. Pecr'estr °ian ancr'vehicular° entr °ies shall hrovicr'e ahigh- quality visual focus using buikr'ing siting, shapes ancr' <br />lamiscaj)ing. Such a feature establishes aI)hvsreal transition between the In olect an llniblic areas, aml <br />establishes the initial sense of high quality cr'evelohrnent. <br />The tsvo phase I entries along Upland Drive are lined with landscaping. The sidewalk created along Upland Drive <br />includes a separated landscape strip with street trees. The eastern -most entrance leads directly to the front of the <br />building. The phase II entice from Minkler Boulevard swill be adjacent to the monument sign surrounded by <br />landscaping. <br />e. 1 ehreular circulation design shall nrrnrnrrze ivewav intersections with the street. <br />Tvvo vehicle access points will be created. In phase I, tivo points will be created along Upland Drive. During <br />phase II, the western -most access on Upland Drive swill be closed and a new access point swill be created from <br />Minkler Boulevard. <br />f. Siteher °irneter° design (i.e., lan(r'scahing, structures, and horizontal tivic1th) shall be coorclinatecl with site <br />clevelovnwnt to ensure a harnlonious transition between acriacent j)roiects. <br />Perimeter landscaping adjacent to the public right of ivay is required by code and helps reduce the visual impact <br />of parking. The proposed building is located in the center of the site. The adjacent properties to the east and west <br />are separated by a thirty foot railroad easement. Tuk vila Municipal Code (18.52.020) does not require side yard <br />landscaping but groundcover will be added to the areas of vehicle overhang along the east and west side yards <br />within the railroad easement if permission is obtained by the railroad. Phase II swill also create a svallcing path <br />SM Page 4 of 11 04, 1.92012 <br />Z: DCD n Clerk's PC Laserfiche Packet attachments L12 -004 Staff Report L12 -004 DR SR (2 )does <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.