City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-05-23 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-05-23 Planning Commission - Southcenter / Tukwila Urban Center and Transportation Element of Comprehensive Plan
>
Planning 2013-05-23 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 3:21:32 PM
Creation date
5/17/2013 1:18:53 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
05/23/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TUKWILA COMPREHENSIVE PLAN <br />Southcenter, Tukwila's Urban Center <br />using physical and natural elements that enhance an area's overall <br />aesthetic, including orienting a building to the street orientation (Figure 28). <br />encourage extensionextendinr of the street grid system <br />10.2.4 Siting and orientation of buildings and parking lots should create an environment that is <br />conducive to walking in the northern part of the Southcenter area, particularly in the area <br />between the Mall, the bus transit center and the Sounder commuter rail/Amtrak station. <br />IMPLEMENTATION STRATEGIES <br />• Over the short to midterm, focus public and private investments and regulations on <br />properties fronting Baker Boulevard between the Mall and the Sounder station. <br />10.2.€5 Require interior vehicular connection between adjacent parking areas wherever possible. <br />10.2.6 Development standards should shall consider the needs of land owners, developers, <br />businesses, and the community. <br />111111111111y11. run. ,uuuuuuu <br />dff <br />ost <br />„117 ii /i ii iiit /iaoo 1,Y# <br />Figure 27 — Site development — pedestrian connections through parking lots connecting street edge <br />to building entrances. <br />Figure 28 — Southcenter site development — building orientation to street <br />raf( May 2013 <br />113 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.