City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-08-22 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-08-22 Planning Commission - Costco / Red Lobster / Seasons 52
>
Planning 2013-08-22 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:09:55 PM
Creation date
8/15/2013 2:32:11 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
08/22/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.Building Design <br />The design of the canopy extension is the same as the existing canopy areas, except that the extension will only <br />cover the four southernmost fueling islands; the canopy area over the north fueling island will not be expanded. <br />The canopy extension will start 32 feet south of the north edge of the existing canopy. This will create horizontal <br />modulation of the roofline in the northwestern area of the canopy. Colored elevations shown on sheet P32-04 of <br />Attachment B state “Color to match existing ‘Mutual Material Rose Brown’”; however, the existing color of the <br />CMU used within the fueling facility is a gray split face CMU. Through correspondence with the applicant, the <br />intent is for the new canopy columns to match the color and material of the existing canopy columns. Staff agrees <br />that the new CMU should match the existing, and recommends a condition of approval to require that the new <br />CMU used in the project be the split-face gray CMU used on the existing columns. <br />Mechanical equipment associated with the fueling facility will be screened by a combination of existing and new <br />landscape plantings. Lighting fixtures and accessories will match the design of existing fixtures and accessories <br />on the fueling site. New signage proposed is not reviewed as part of this design review but instead will be <br />reviewed under separate sign permit(s). <br />5.Miscellaneous Structures <br />Miscellaneous structures, including fueling dispensers, trash receptacles, and bollards, will match those already <br />existing within the fueling facility, and are typical of the miscellaneous structures associated with gas stations. <br />COMPREHENSIVE PLAN GUIDELINES <br />Commercial Areas Goal 1.7 <br />The project meets the Commercial Areas Goal. The project is going through design review. Sidewalks are <br />preexisting and lighting will be added to the site. Six parking spaces are proposed to be removed, but the remaining <br />number of parking stalls greatly exceeds the required number of parking spaces for the optical facility. <br />RECOMMENDATION <br />Staff recommends that the BAR adopt the Findings and Conclusions of the staff report and approve the request subject to <br />the following conditions. <br />1.Irrigation is required in the new landscape area. An irrigation plan shall be submitted as part of the building <br />permit. <br />2.Wheelstops shall be added to the 20 parking spaces located adjacent to the new landscape area to prevent damage <br />to the plantings. <br />3.The following information shall be added to the landscape planting plans as part of the building permit: <br />a. Add a note that all wire and twine and the top 2/3 of burlap are to be removed from B& B plants before <br />planting. <br />b.Add specifications for plant quality per ANSLA standards, including for B&B trees. <br />c.The new planting strip needs to have good soil preparation to ensure that soils are decompacted and <br />loosened to at least 18 inches and that resulting planting soils have at least 10% organic material in them (via <br />the addition of compost like Cedar Grove or equivalent that is tilled in to the soil). Notes should be added to <br />the plan about soil preparation. <br />d.Provide specifications for mulch and its application. <br />e.Add planting notes – top of root ball even with soil surface, loosen root ball and straighten or prune any <br />circling roots in container-grown plants before planting, etc. <br />4.Concrete block used on the new fueling facility columns shall by gray split face CMU to match the material and <br />color used on the existing canopy columns. <br />JR Page 10 of 11 08/14/2013 <br />H:\Design Review\Costco Gas Station\SR_L13-038 Costco Fueiling Facility Expansion.docx <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.