City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
04-023 - King County / City of Renton - Trans-Valley Corridor Intelligent Transportation System
COT-City
>
City Clerk
>
Interlocal Agreements
>
2004-2009 Interlocal Agreements
>
04-023 - King County / City of Renton - Trans-Valley Corridor Intelligent Transportation System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2010 11:26:20 AM
Creation date
10/4/2010 8:59:40 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
04-023
Contractor (example *sabey*)
King County & City of Renton
Description (example *tourism*)
Trans-Valley Corridor Transportation System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.2 Tukwila hereby grants the County right of entry into the corporate limits of Tukwila <br />for the purpose of performing any and all tasks necessary to complete the Project. <br />Right of entry is contingent upon City of Tukwila approval of site specific traffic <br />control plans pnor to construction Changes or modifications (of a significant nature) <br />to the construction plans or approved traffic control shall be approved by Tukwila <br />pnor to construction <br />4 3 Tukwila shall design and construct Tukwila's own Green River Interconnect project <br />"Tukwila Project that installs fiber optic cable on S 180 Street between <br />Southcenter Parkway and Oaksdale Avenue, on S Carr Road between 106 Ave S <br />and SR 515, and on SR 515 between Carr Road and Benson Road S Tukwila shall <br />complete the Green River Interconnect project no later than July 1St 2004 All costs <br />associated with the Tukwila Project shall be the full responsibility of Tukwila. <br />5 CONSTRUCTION CONTRACT BIDDING <br />5 1 The County shall prepare the contract bid documents. <br />5 2 The County shall advertise the contract in the official legal publication for the County <br />and, if necessary, other newspapers to provide the widest possible coverage <br />commensurate with the size of the Project. The Cities will be responsible for <br />additional notification, such as door -to -door flyers <br />5 3 The County will provide to the Cities two copies of the plans and specifications <br />advertised for the contract. <br />5 4 The County will open the bids, which is typically three weeks after the Project is <br />advertised. The Cities are invited to attend the opening of the bids. <br />5 5 The County will tabulate the bids The County shall provide a dated, verified copy of <br />the bid tabulations to the Cities The bid tabulations will identify the estimated <br />construction, inspection and overhead cost, based upon the lowest responsible bid. <br />5 6 The County shall award the contract to the lowest responsible bidder for the Project, <br />subject to applicable laws and regulations <br />6. CONSTRUCTION CONTRACT ADMINISTRATION <br />6 1 The County shall provide the necessary engineering, administrative, inspection, and <br />clencal services necessary for the execution of the Project. In providing such services <br />within the Cities, the County Road Engineer may exercise all the powers and perform <br />all the duties vested by law in the City Engineer or other City officer or department <br />charged with street administration <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.