City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-02-28 Transportation and Infrastructure
>
TIC 2017-02-28 Item 2C - Contract Supplement #16 - Baker Boulevard Non-Motorized Improvements with KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:46 PM
Creation date
2/23/2017 3:20:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />Task No 2.0 Right -of -Way and Additional Survey Services: <br />Task No. 2.10 Review Title Reports & Update Easements <br />KPG shall provide a review of previous City construction projects to verify <br />easements for sidewalks along Baker and Andover Park E. Easements shall be <br />added to the base map. Files from the past projects showing easements shall <br />be provided by the City. <br />KPG shall update the existing base map to include new curb ramps for the <br />east/west directions at the intersection of Baker Blvd and Andover Park E that <br />are to be installed in conjunction with water main and sewer replacements <br />under a separate project. CADD files for this shall be provided by the City. <br />Note: With the exception of the new ramps, survey for Baker Blvd and <br />Christensen has been completed, including existing illumination, signal poles, <br />cabinets, and signal loops. No underground utilities have been located. <br />Underground utility locates are not anticipated under this task. <br />Deliverables <br />0 Updated Survey Project Base Map with sidewalk easements and updated <br />curb ramps. <br />Task No 3.0 Preparation of Contract Documents (PS&E) <br />Task No. 3.10 - Repackaging Plans & Incorporating Signal Modifications <br />KPFF and KPG shall assist the City in determining the Baker roadway striping, <br />including design of protected bicycle facilities, as outlined in the King County <br />Parks and Recreation and City of Tukwila, Mobility Connections Facilities <br />Agreement for Baker Blvd and Christensen Road, approved 12/05/16. North- <br />south curb ramps will be upgraded to current City standards <br />Work includes modification of existing signal design at the intersection of <br />Andover Park E and Baker Blvd, field review of existing signal <br />equipment/ conduit/wiring, video detection installation, loop abandonment, <br />APS push button installation, push button landing area compliance field <br />verification, coordination with City for new installation of East/West curb <br />ramps (associated with Andover Park E Water Main and Sewer replacement <br />project), countdown pedestrian heads, electrical wiring pole adjustments, ITS <br />raceway verification/design and signal controller upgrades. Work also includes <br />the redesign of current plans based on reuse of existing electrical service <br />cabinet at the intersection of Christensen Road and Green River Trail access <br />point. This does not include relocation modifications to the existing controller <br />service cabinets. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.