Laserfiche WebLink
Page 2 <br />Task No 2.0 Right -of -Way and Additional Survey Services: <br />Task No. 2.10 Review Title Reports & Update Easements <br />KPG shall provide a review of previous City construction projects to verify <br />easements for sidewalks along Baker and Andover Park E. Easements shall be <br />added to the base map. Files from the past projects showing easements shall <br />be provided by the City. <br />KPG shall update the existing base map to include new curb ramps for the <br />east/west directions at the intersection of Baker Blvd and Andover Park E that <br />are to be installed in conjunction with water main and sewer replacements <br />under a separate project. CADD files for this shall be provided by the City. <br />Note: With the exception of the new ramps, survey for Baker Blvd and <br />Christensen has been completed, including existing illumination, signal poles, <br />cabinets, and signal loops. No underground utilities have been located. <br />Underground utility locates are not anticipated under this task. <br />Deliverables <br />0 Updated Survey Project Base Map with sidewalk easements and updated <br />curb ramps. <br />Task No 3.0 Preparation of Contract Documents (PS&E) <br />Task No. 3.10 - Repackaging Plans & Incorporating Signal Modifications <br />KPFF and KPG shall assist the City in determining the Baker roadway striping, <br />including design of protected bicycle facilities, as outlined in the King County <br />Parks and Recreation and City of Tukwila, Mobility Connections Facilities <br />Agreement for Baker Blvd and Christensen Road, approved 12/05/16. North- <br />south curb ramps will be upgraded to current City standards <br />Work includes modification of existing signal design at the intersection of <br />Andover Park E and Baker Blvd, field review of existing signal <br />equipment/ conduit/wiring, video detection installation, loop abandonment, <br />APS push button installation, push button landing area compliance field <br />verification, coordination with City for new installation of East/West curb <br />ramps (associated with Andover Park E Water Main and Sewer replacement <br />project), countdown pedestrian heads, electrical wiring pole adjustments, ITS <br />raceway verification/design and signal controller upgrades. Work also includes <br />the redesign of current plans based on reuse of existing electrical service <br />cabinet at the intersection of Christensen Road and Green River Trail access <br />point. This does not include relocation modifications to the existing controller <br />service cabinets. <br />23 <br />