Laserfiche WebLink
1, a contract supplement will be prepared, if necessary, to carry the project into final design and <br />construction document preparation. Otak will not proceed beyond Phase 1 Intake Review and <br />Charter Meeting without authorization of the City. <br />Phase 2 — Permitting and Final Design <br />In Phase 2, Otak will bring the 75- percent plans completed by another consultant up to a 100 - <br />percent complete construction documents, including plans, specifications, and construction cost <br />estimate (PS &E). <br />Project Criteria <br />The City will designate the project parameters and design criteria. Reports and plans, to the extent <br />feasible, shall be developed in accordance with the latest edition and amendments as of the date of <br />the Notice to Proceed, of the following documents. Changes in any design standards or <br />requirements after work has begun may result in Extra Work. <br />City of Tukwila <br />City of Tukwila Infrastructure Design and Construction Standards 2010 <br />City of Tukwila Development Guideline and Design and Construction Standards <br />City of Tukwila Comprehensive Plans, including Sewer, Water, Surface Water and Land Use <br />King County <br />• King County Surface Water Design Manual (KCSWDM) 2016 <br />Washington State Aquatic Habitat Guidelines Program <br />• Stream Habitat Restoration Guidelines 2012 <br />• Integrated Streambank Protection Guidelines 2002 <br />Washington State Department of Fish and Wildlife (WDFW) <br />• Water Crossing Design Guidelines 2013 <br />Washington State Department of Transportation (WSDOT) <br />Washington State Department of Transportation Standard Specifications for Road, Bridge, and <br />Municipal Construction (M41 -10) 2016 <br />• Standard Plans for Road, Bridge, and Municipal Construction (M21 -01) <br />United States Department of Transportation, Federal Highway Administration (FHWA) <br />• Manual of Uniform Traffic Control Devices (MUTCD) as amended and approved by WSDOT <br />American Association of State Highway and Transportation Officials (AASHTO) <br />24 <br />