Laserfiche WebLink
• LRFD Bridge Design Specifications, Fourth Edition, 2007 and the current Interims <br />• A Policy on Geometric Design of Highways and Streets, 5 "' Edition, 2004 <br />• Guide for the Development of Bicycle Facilities 1999 <br />Project Schedule <br />The preliminary project schedule will be developed upon notice to proceed for the project and <br />updated as changes occur. The anticipated major milestones are: <br />Phase Milestone <br />1 Intake Review <br />1 Charter Meeting <br />1 Submission of Joint Aquatic Resource Permit Application DARPA) <br />2 Preparation of 100 - percent Plans, Specifications, and Estimate <br />The duration of the reviews by the City, WSDOT, WDFW, Ecology, and the Corps of Engineers <br />will be provided in the project schedule. Mutually agreeable changes to the project schedule, whether <br />initiated by the City or Otak, may be the basis for adjustments in the project budget. <br />Items and Services to Be Furnished by the City <br />The City will provide the following items and services to Otak that will facilitate the engineering <br />design and preparation of the construction documents for work within the limits of the project. <br />Otak is entitled to rely on the accuracy and completeness of this and other data furnished and <br />represented by the City and others, including but not limited to survey, and hydrologic and hydraulic <br />analyses. <br />• Available as -built drawings and information on other projects in the immediate vicinity. <br />• Topographic survey needed for the project in AutoCAD format (2007 or compatible), including <br />field locates of utility markings, sensitive area delineation flags, potholes and boring locations. <br />Included in the survey work provided by the City will be any bathymetry or underwater <br />surveying required for the project. <br />• Boundary mapping including right -of -way determination and property lines adjacent to project <br />vicinity. <br />• Final stamped and signed right -of -way plan, based on proposed project needs determined by the <br />Consultant. <br />• Rights -of -entry upon all lands necessary for the performance of the work, including official <br />notices to property owners and agencies. <br />• Timely reviews of Otak submittals at the mutually agreed upon times set forth in the project <br />schedule and the consolidation of all review comments by others onto one review set prior to <br />return to Otak. <br />• Payment of all application reviews and /or permit fees. <br />25 <br />