City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 Item 2B - Agreement - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 Item 2B - Agreement - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:28:39 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Compilation, reproduction, and distribution of Bid Documents to potential bidders and <br />interested parties. <br />• Mailing list preparation and distribution cost for public notices. <br />• Advertisement for Bid <br />PHASE I— INTAKE REVIEW AND CHARTER MEETING <br />Task I — Project Management(Phases I and 2) <br />1.1 Project Management and Coordination <br />Otak will manage contract issues, coordinate execution of the project, and meet periodically with the <br />City project manager and City staff. Some of the tasks include: <br />• Preparing a work plan. <br />• Conducting a kickoff meeting at the beginning of the project. <br />• Meeting with the City project manager and /or staff periodically. <br />• Modify Phase 2 services of the project, if required and authorized by the City. <br />A project work plan will be prepared and a kickoff meeting held at the start of the project to define <br />project goals and design criteria, and to discuss project approach, process and schedule with the <br />design team. A project schedule (MS Project) will be developed and maintained as part of this task. <br />Otak's project manager will provide direction to the project team, including subconsultants, and <br />conduct project coordination meetings with appropriate task leaders. The project manager will <br />monitor the project planned budget versus actual progress and take corrective actions if necessary. <br />Otak will prepare and submit monthly invoices and a brief progress report to reflect progress over <br />the last billing period and anticipated activities over the next billing period. <br />1.2 Quality Assurance /Quality Control (QA/QC) <br />The project work will receive quality checks at appropriate junctures in the progress. Specifically, the <br />design plans, cost estimates, technical memoranda, and reports will be reviewed by at least one <br />senior design team member with knowledge of the subject matter and by Otak's Project Manager/ <br />Principal in Charge. <br />Assumptions: <br />1. Otak's Project Manager will meet face to face with the City Project Manager and or Project <br />Engineer on as- needed basis. For budget purposes, Otak will assume four meetings, excluding <br />kick -off meeting; one meeting will be held at Otak's office. Meeting time for the Project <br />Manager and Principal In Charge is budgeted under this task. Meeting time for other design <br />team members is budgeted under the tasks each works on. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.