City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 Item 2B - Agreement - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 Item 2B - Agreement - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:28:39 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Internal project team coordination meetings will be held on a monthly basis during the project <br />duration. These meetings will be in addition to the coordination meetings held with the City, but <br />budgeted as part of the specific work tasks. <br />3. QA /QC will be required for review of plan sheets, specifications, cost estimates, and technical <br />memoranda. Calculations for structures and hydrologic and hydraulic modeling are provided by <br />Tukwila and are not included in this scope of services, if need calculations will be provided as an <br />additional service. <br />4. Phases 1 and 2 will be completed in three (3) months. <br />Deliverables: <br />1. Monthly Invoices and Progress Reports. <br />2. Project Work Plan. <br />3. Meeting summary notes. <br />Task 2 — Intake Review <br />2.1 Review Existing Data <br />Otak will gather information pertinent to the project and review the base map prepared by the City <br />for project use. Some of the tasks include the following: <br />• Conduct a site visit to become familiar with the site conditions and take photographs, gather <br />field measurements, and record observations. <br />• Coordinate with the City to collect available information pertinent to the project, including the <br />following documents prepared in association with the 75- percent plans: <br />• Critical Areas Assessment for Riverton Creek Flap Gate Removal Project <br />• Riverton Creek Flap Gate Removal Hydraulic Analysis <br />• Riverton Creek Flap Gate Removal Project- Flood Prevention Feasibility Study <br />• Riverton Creek F lap Gate Removal Project- Preliminary Stream Enhancement Plan <br />• Report- Geotechnical Engineering Services Proposed Pacific Highway South Bridge <br />• Riverton Creek Flap Gate Removal Project Wall Strengthening Feasibility Study <br />• King County Assessor's Map <br />• 75- percent PS &E <br />• Concept Plan <br />Request additional information as needed for project use. <br />2.2 Site Reconnaissance <br />Otak will perform site reconnaissance to confirm the characterizations and delineations shown in <br />the existing project reports are still valid, and that these are sufficient to support the permit <br />applications. The following features will be included in the reconnaissance: <br />• Confirmation of previously conducted wetland delineation and characterization. <br />• Confirmation of Stream habitat conditions. <br />27 <br />