City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-09 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-05-09 Transportation and Infrastructure
>
TIC 2017-05-09 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:48 PM
Creation date
5/4/2017 1:45:37 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/09/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
40th — 42ND Avenue South — Phase III <br />City of Tukwila <br />4.9 Review ROM and material testing results and advise the Contractor accordingly. <br />4.10 Review the Contractor's baseline project schedule, and then monitor that schedule throughout <br />the course of the project for compliance with the provisions of the Contract. Monitoring shall <br />include review of periodic schedule updates submitted by the Contractor. <br />4.11 Chair up to 33 weekly construction meetings. <br />4.12 Prepare official correspondence to the Contractor and issue upon the Client's approval. <br />4.13 Issue field directives and stop work notices to the Contractor upon direction of the Client's <br />approval. <br />4.14 Issue Correction Notices when appropriate. <br />4.15 Review monthly pay estimates with the Contractor and provide recommendation to the Client <br />for release of payment. <br />4.16 Supervise contract close -out activities including as -built drawings, final payment, and <br />completion notices. Consultant shall provide the Client, at contract close -out, construction <br />records to the all applicable funding agencies. <br />4.17 The Consultant shall assume no responsibility for proper construction techniques or job site <br />safety but will report to the Contractor and Client any observed public safety concerns <br />immediately. The presence of the Consultant's personnel at the construction site is for the <br />purpose of providing to the Client a greater degree of confidence that the completed work will <br />generally conform to the Contract Documents and that the integrity of the design concept as <br />reflected in the Contract Documents has been implemented and preserved by the construction <br />Contractor. <br />4.18 The Consultant will endeavor to protect all parties against defects and deficiencies in the work <br />of the Contractor, but cannot guarantee the Contractors' performance and shall not be <br />responsible for construction means, methods, measurements, techniques, sequences of <br />procedures, or for safety precautions and programs in connection with the work performed by <br />the construction contractor and any subcontractors. <br />Subtask 5 — Public Outreach / Client Meetings <br />The Consultant's construction inspector shall provide assistance with project outreach consistent with the <br />hours included in EXHIBIT B. Outreach assistance includes the following: <br />The Consultant shall, under direction of the Client, assist with delivering informational flyers for the <br />upcoming construction activities, road closures, temporary traffic controls, and other pertinent information. <br />The Consultant shall also assist the Client in responding to questions and issues raised by private citizens <br />and local businesses relative to the Project and provide monthly updates to the city for use on city <br />webpage updates. <br />Subtask 6 — Change Order Resolution <br />The Consultant shall prepare change orders and associated change order backup documentation <br />consistent with the hours provided in EXHIBIT B. This includes change order plans and specifications, <br />independent engineer's cost estimates, negotiations, and justification memos. <br />Subtask 7 — Electronic Record Drawings <br />The Consultant shall provide electronic as -built mark ups on the CAD files (CAD files provided by others) <br />utilizing as -built plans provided by the contractor. Along with the electronic files, the Consultant shall <br />provide mylar hard copies of the electronic as- builts. The Consultant is not responsible for any changes to <br />the plans or stamping of any plan revisions that may occur as the work progresses. If this is required, this <br />shall be done by others. <br />Page 4 of 6 Updated: 5/3/2017.&4A244-7 44-7 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.