City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2017-06-22 Item 4 - Foster High School Expansion and Birth to Kindergarten - Attachment H: Applicant Response to Conditional Use Permit Criteria
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2017-06-22 Planning Commission / Board of Architectural Review - Foster High School Expansion and Birth to Kindergarten
>
Planning 2017-06-22 Item 4 - Foster High School Expansion and Birth to Kindergarten - Attachment H: Applicant Response to Conditional Use Permit Criteria
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 1:18:07 PM
Creation date
6/16/2017 1:18:06 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
06/22/17
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindsay Brown 1111 <br />February 28, 2017 X111111111111 <br />2160226.30 »llJllJ /a „�% <br />Page 3 of 10 i�tgggp <br />The student parking lot between the school and pool building will be modified to <br />accommodate the new building additions and fields. The small parking area at the <br />southwest building corner close to the front entry will be re- designed to serve 16 <br />parking spaces while maintaining a wide pedestrian connection to the front entry. Bus <br />drop -off areas at the west and south side of the existing building will remain <br />unchanged. Total onsite parking provided is 177 spaces. An additional 11 spaces will <br />be available for special events in the bus loop. <br />• Plazas, courtyards, and other outdoor pedestrian areas will be designed to be long <br />lasting and serve both functional and aesthetic needs. New site paving, walls, ramps, <br />and stairs will be cast in place concrete. Opportunities for students, faculty, and <br />visitors to gather in small and large groups, in both active and passive ways, will be <br />developed. Seating will be provided by a combination of seat walls, movable chairs, or <br />pre- manufactured benches. <br />The existing softball field and tennis courts will be relocated, and the existing portables <br />demolished. The field area will be redesigned to accommodate one baseball field, one <br />softball field, and two tennis courts. The new softball and baseball fields will have new <br />fencing, backstops, dugouts, all- weather sand infields, and natural grass outfields, <br />which will be irrigated. Pedestrian connections will be provided to the residential <br />neighborhood to the north and to the stadium. All new tennis courts will have new <br />fencing, acrylic surfacing, and netting. <br />• Install fencing and netting around the fields. <br />• Perimeter buffer improvements at the north property line and parking lot landscaping <br />will be provided to meet the minimum requirements of the code and as agreed upon <br />with the City of Tukwila. Trees along the existing street frontages and the site's <br />perimeter will be preserved where feasible. <br />• Add new First Responder antennae system, if required. <br />• Add new emergency generator, improved HVAC system, refurbish air - handling system, <br />and add a new efficient boiler. <br />• Provide safety additions, such as secure entries, upgraded camera surveillance <br />system, and added perimeter security fencing and gates. <br />New Birth -to- Kindergarten Center: <br />The new Birth -to- Kindergarten Center (B2K) will provide comprehensive early learning services <br />in an environment focused on the developmental needs of young learners from infancy to <br />kindergarten. The 53,000- square foot, two -story facility will be constructed on District owned <br />land that is contiguous to existing Showalter Middle School and Foster High School Campus. <br />Efficient site planning and creative use of space is an important part of the site design, due to <br />the close proximity to Showalter Middle School, surrounding sensitive areas, and residential <br />neighbors. <br />1'f � _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.