City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-09-26 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-09-26 Transportation and Infrastructure
>
TIC 2017-09-26 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:52 PM
Creation date
9/21/2017 8:48:21 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/26/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D.2 INSTALLATION & KICKOFF <br />D.2.A SOFTWARE INSTALLATION <br />The Implementation Specialist will assist the System Administrator with downloading the LucityAM <br />Installation Components (current version with latest service pack) from the Lucity Support Center web <br />site, and following instructions provided in the Install Manual. <br />Our assumption is the System Administrator will complete related Installation activities, including: <br />• Establishing multiple environments for testing/training, production, and backup/recovery <br />• Using User Import tool in Lucity Security to import users into LucityAM, and associate users to <br />Windows Login accounts <br />• Using Lucity Security to set controls for user access and assign group/role permissions for <br />various LucityAM functions <br />• Performing system -level testing (to ensure satisfactory performance) and performance tuning <br />actions (if necessary) <br />D.2.B PROJECT KICKOFF <br />A Kickoff Meeting will be held to transfer knowledge between Project Team members, gather <br />information, and set the stage for subsequent tasks. An outline of the expected Kickoff Meeting <br />activities follows. <br />• LucityAM Software Demonstration <br />— Present functional overview — typical user workflows for inspections, work orders, etc. <br />and "out of the box" capabilities including reporting (standard templates and ad hoc), <br />GIS integration, and data interfaces <br />— Review default "Work Flow Setup" data, UI templates (dashboards and data <br />forms/views), and default user groups/roles <br />• Functional Groups <br />— Identify each distinct Functional Group's place (Department, Division, etc.) within the <br />organizational structure of the City <br />- Confirm with each Group Administrator those persons assigned to serve as Group SMEs <br />for AMS configuration <br />- Examine current basic business processes of each Group with associated data, reporting, <br />and integration requirements <br />— Review with each Group their Work Flow Setup spreadsheet with default data — <br />spreadsheet to be completed by the City <br />• GIS and IT <br />- Discuss completed Installation task and related activities, and identify needed actions <br />prior to initiation of Configuration — GIS <br />• Access <br />- Verify Implementation Lead has access into installed LucityAM <br />• Project Plan <br />- Confirm Project Team and Functional Groups <br />- Discuss what is expected of Project Team members throughout project <br />- Review schedule, and discuss how LucityAM will "go -live" <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.