City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-09-26 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-09-26 Transportation and Infrastructure
>
TIC 2017-09-26 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:52 PM
Creation date
9/21/2017 8:48:21 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/26/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
— Identify any needed revisions to Project Plan based on knowledge gained from the <br />Kickoff Meeting sessions <br />— Set date for Configuration — Discovery <br />• Action Items <br />— Complete Work Flow Setup spreadsheets —these spreadsheets are used to record data <br />required to define Categories, Problems, Causes, Tasks, and Resources (Employees, <br />Crews, Equipment, Materials, Fluids, Contractors) for Functional Groups with LucityAM <br />Work — Work Administrator <br />Participants in the Kickoff Meeting should include the following Project Team members: <br />• Lucity • City <br />— Project Manager — Project Manager <br />— Relationship Manager — System Administrator <br />— Project Coordinator — Functional Group Administrators <br />— SMEs—GIS and IT <br />— Project Sponsor <br />D.3 CONFIGURATION <br />D.3.A DISCOVERY <br />A Discovery Workshop will be completed — this workshop will consist of a series of sessions that focus <br />on refining the default LucityAM configuration to support the specific operational needs of the <br />Functional Groups. An outline of the expected Discovery Workshop activities follows. <br />• Functional Groups <br />- Examine details (what, who, how, and why) of business processes of each Group, and <br />identify potential revisions to improve results and best leverage capabilities of LucityAM <br />- Review with each Group their completed Work Flow Setup spreadsheet, and identify <br />any additional data revisions for initial LucityAM configuration <br />- Identify revisions to dashboards, data forms/views, and default user groups/roles for <br />each Group <br />- Discuss available data from sources other than GIS to be incorporated (i.e. "loaded") <br />into LucityAM — data to be gathered by the City <br />Identify any supplemental reporting and/or integration needs to be addressed with <br />LucityAM implementation <br />• GIS <br />- Discuss use of LucityAM Administration tool — Map Setup to define maps, and assign to <br />user groups/roles <br />IT <br />— Download and install LucityAM Mobile and configure for use with Lucity Mobile Server <br />• Project Plan <br />- Identify any needed revisions to Project Plan based on knowledge gained from <br />Discovery activities <br />- Set date for Configuration — Functional Groups task <br />• Action Items <br />— Apply initial configuration to installed LucityAM based on revised Work Flow Setup data <br />and revised user dashboards, data forms/views, maps, and groups/roles <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.