City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:21 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />Task 100 Assumptions: <br />1. It is anticipated that the project duration will be 3 months. <br />2. Consultant will develop meeting materials, agenda, attend meetings, and develop <br />meeting minutes. <br />Task 100 Deliverables: <br />1. Project Management Plan summary in PDF format. <br />2. Monthly invoices and progress reports in PDF format. <br />3. Updated project schedules in PDF format. <br />TASK 200 - PRELIMINARY DESIGN <br />The objective of this task is to collect all available information, verify existing utilities within the <br />project area, identify potential conflicts, and to verify existing hydraulic conditions. <br />• Conduct initial site workshop to identify existing information needs and to verify design <br />requirements. The site workshop will serve as the project kick-off meeting. <br />• Coordinate utility locating to be complete using One -Call system. This task assumes that <br />the City will call in locates based on locations identified by Consultant. <br />• Perform topographic survey of proposed excavation locations for the replacement of the <br />existing 12 -inch ductile iron water main. <br />• Verify existing utilities and surface features in locations where excavation work is not <br />anticipated. <br />• Update hydraulic model based on survey. City to conduct hydrant flow test for the MLK <br />main. Calibrate model to the hydrant test. Perform hydraulic analysis to confirm available <br />fire flow and system pressures. <br />• Research alternative materials for the possible water main replacement. This task <br />assumes that three (3) material options will be researched: HDPE, FPVC, and CIPP, <br />and that slip lining the existing water main is the only feasible option for replacement. In <br />the event that slip lining does not meet the design flow criteria, the City will reevaluate <br />alternative options for providing service to the affected area. <br />• Prepare a short draft Preliminary Design letter. <br />• Conduct internal QA/QC. <br />• Attend a Preliminary Design Workshop to present the draft preliminary design letter. <br />• Prepare a comment design response. <br />• Prepare a final Preliminary Design letter. <br />Task 200 Assumptions: <br />1. The City will provide all available record information, including surveys, drawings, <br />studies, and geotechnical reports for 12 -inch water main. <br />2. This task will include no more than three (3) alternatives. <br />3. The design criteria meeting will coincide with the information data review/request <br />meeting. <br />4. No geotechnical explorations are anticipated for this scope of work. <br />5. No environmental assessments are required for this scope of work. <br />6. No easements will be required for this work. <br />7. The City will perform the hydrant flow testing and will be responsible for disposal of the <br />water. <br />pw:\\CarollolDocuments\ <br />82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.