City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-09 Item 2D - Agreement - 2018 Annual Small Drainage Program Design with KPG Inc
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-04-09 Transportation and Infrastructure
>
TIC 2018-04-09 Item 2D - Agreement - 2018 Annual Small Drainage Program Design with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:58 PM
Creation date
4/5/2018 2:56:55 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/09/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 2 — Preliminary Design / Feasibility Analysis <br />2.1 The Consultant shall prepare survey, analysis, and provide recommendation with preliminary <br />horizontal layout and cost estimate for preferred design on Site 6. Survey will extend the length of the <br />wall from the curb flowline to 10' behind wall and include all observed drainage facilities within the <br />limits as well as contributing upstream drainage structures where locations are known. Aerial mapping <br />may be utilized if improvements are recommended outside of detailed survey limits. <br />2.2 The Consultant shall field review previous design and easement documents prepared in 2002 for Site 7 <br />and update to include current layout and cost estimates. The City will work with property owner to <br />obtain easement rights. Existing mapping will be supplemented with aerial mapping if necessary. <br />2.3 The Consultant shall subcontract with a geotechnical consultant to perform one (1) Pilot Infiltration <br />Test at the area of concern. Based on findings of infiltration results, the Consultant shall evaluate <br />feasibility of infiltration systems or piping extension and prepare preliminary layout and cost estimate <br />on aerial mapping. <br />Additional Services <br />The City of Tukwila may require other services of the consultant. These services could include additional <br />design, right of way, utility potholing, environmental documentation, construction phase services, or other <br />work tasks not included in the scope of work. At the time these services are required, the Consultant will <br />provide the City with a detailed scope of work and an hour and fee estimate. The Consultant will not <br />proceed with the work until the City has authorized the work and issued a Notice to Proceed. <br />City of Tukwila KPG, Inc. <br />2018 Small Drainage Program Page 5 of 5 March 1018 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.