City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-11-19 Item 2A - Agreement - 2020 Transportation Demand Management with King County Metro
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2019 Transportation and Infrastrucutre Packets
>
2019-11-19 Transportation and Infrastructure
>
TIC 2019-11-19 Item 2A - Agreement - 2020 Transportation Demand Management with King County Metro
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:25 PM
Creation date
11/14/2019 1:39:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/19/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Historic Preservation <br />The Contractor agrees to assist the Federal Government in complying with section <br />106 of the National Historic Preservation Act, as amended, 16 USC § 470f, <br />Executive Order No. 11593, "Protection and Enhancement of the Cultural <br />Environment," 16 USC § 470 note, and the Archaeological and Historic <br />Preservation Act of 1974, as amended, 16 USC §§ 469a-1 et seq. involving historic <br />and archaeological preservation as follows: <br />1. The Contractor agrees to consult with the State Historic Preservation <br />Officer about investigations to identify properties and resources listed in or <br />eligible for inclusion in the National Register of Historic Places that may be <br />affected by the Project, in accordance with Advisory Council on Historic <br />Preservation regulations, "Protection of Historic and Cultural Properties," <br />36 CFR Part 800, and notifying FTA of those properties so affected. <br />2. The Contractor agrees to comply with all federal requirements to avoid or <br />mitigate adverse effects on those historic properties. <br />F. Mitigation of Adverse Environmental Effects <br />The Contractor agrees that if the Project should cause adverse environmental <br />effects, the Contractor will take all reasonable steps to minimize those effects in <br />accordance with 49 USC § 5324(b), and all other applicable federal laws and <br />regulations, specifically, the procedures of 23 CFR Part 771 and 49 CFR Part 622. <br />1-16 Preference for Recycled Products <br />Recovered Materials - The contractor agrees to comply with all the requirements of <br />Section 6002 of the Resource Conservation and Recovery Act (RCRA), as amended (42 <br />U.S.C. 6962), including but not limited to the regulatory provisions of 40 CFR Part 247, <br />and Executive Order 12873, as they apply to the procurement of the items designated in <br />Subpart B of 40 CFR Part 247. <br />1-17 Termination Provisions Required <br />All contracts and subcontracts in excess of $10,000 shall contain contractual provisions or <br />conditions that allow for termination for cause and convenience by the County including the <br />manner by which it will be effected and the basis for settlement. <br />(Required by FTA Circular 4220.1F, Page IV-13). <br />`*1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.