City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2A - Update - Public Works Operations Campus
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2A - Update - Public Works Operations Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:14:46 PM
Creation date
8/3/2023 3:14:21 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Safety Plan <br />Tukwila Public Works Operation Campus <br />Monthly Update <br />July, 2023 <br />Key Project Metrics <br />Report Date <br />July, 2023 <br />Previous Month <br />Discussion <br />Current Anticipate <br />Construction Start Date: <br />May 1, 2025 <br />N/A <br />No change from <br />information <br />provided to the City <br />Council in May of <br />2023. <br />Design/Preconstruction <br />Cost Estimate: <br />$5,974,412 <br />N/A <br />Total Preliminary <br />Construction Cost: <br />$79,265,000 <br />N/A <br />Near Term Council Decision <br />and Key Dates: <br />Review schematic <br />design and cost <br />estimates by end of <br />year. <br />N/A <br />Key Tasks <br />Program <br />• Architects held several program confirmation meetings/workshops with the user groups for <br />sizes of spaces and adjacencies. <br />• Architects had a meeting to understand the server and IT equipment needs. Looking to see if <br />there is space to bring other IT equipment from the City Hall campus to the Public Works site. <br />Entitlements <br />GC/CM Approval <br />• On July 27, 2023 the City received unanimous approval from the State of Washington Capital <br />Projects Advisory Review Board to utilize alternative contractor selection for the project. The <br />City's application included two parts, 1) to utilize GC/CM for the general contractor for the <br />project and 2) and, on the recommendation from John Palewicz, to utilize an alternative <br />selection process for the earthwork subcontractor on the site. As the Council is aware, the City <br />utilized the GC/CM process for the construction of the Justice Center and the Fire Station <br />projects. GC/CM allows the City to bring in a contractor early in the design process and allows <br />the City to get cost estimates as the project progresses. GC/CM should allow the City to better <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.