City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2012-09-27 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2012-09-27 Planning Commission - McMicken Court / Work Session
>
Planning 2012-09-27 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:07:30 PM
Creation date
9/21/2012 11:12:18 AM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
09/27/12
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The develol)rnentl)rovides al)l)rol)riate structural transitions (i.e. arse of Similar building scale, cornl)atil <br />architectural srides, etc.) between residential and eonwwreial areas (7.7.7). <br />The building scale is defined by the zoning code. The surrounding developments are one or one and -a -half <br />stoic The architectural style is traditional. The surrounding built environment consists of older bungalows <br />and nondescript commercial structures. <br />4. The develol)nwnt enrl)lol°s design elements that hell) to blend it in with the character of the residential <br />neighborhood (7.7.9). <br />The building employs residential architecture features includin lap siding, asphalt roofing shingles, vinyl <br />windows, and a hip roof. <br />.5. Where there are existing res0entaal structures on site, the eonwwrcial develol)nwnt should be achieveCl <br />hriinar °ill' through neti! construction, rather than the convey Sion ofexisting residential structures to cornrnercial <br />uses (7.7.3). <br />There are no existing structures on the site. <br />G. Through l)arkingl)laeernent and setbacks (e.g loeating1mrking behind or beside buildings), the develol)nwnt <br />should hell) to achieve conymctness ofbuilding form andl)edestrian orientation, helping to create a focall)oint <br />in the Residential Conwwreial Center (7.7.4). <br />Parking is located at the side and rear of the building. The building site is limited by existing parking and <br />access easements across the west and north of the parcel. The building is setback farther than code requires and <br />about five feet lower than the right of ivay. <br />CONCLUSIONS <br />DESIGN REVIEW CRITERIA <br />1. Site Design <br />The proposed site design meets the design review criteria. The project developer ivas faced with the challenge of <br />creating a project that is harmonious with a neighborhood that shows signs of age and disinvestment. The <br />existing homes are overv,-helm*nglv smaller and shorter than code allows and the commercial development is only <br />one stoi while the code allows three stories. The height and scale of the building are limited by code and the <br />building's size is constrained by parking and recreation space requirements. In order to harmonize with the <br />adjacent single fancily homes, the project proposes a "residential appearance" to the upper two stories of the <br />building where the residential units are located. Finish materials are residential in appearance and the building's <br />traditional architecture is respectful of the surrounding development. <br />The nature of a mixed -use building is to create commercial space that is visually and physically accessible from <br />the public sways leaving more private spaces available for non-commercial or residential uses. To achieve this <br />end, eight of the nine residential units are located on the tsvo upper floors and the one accessible unit is located on <br />the ground level at the rear of the building. A sidewalk with landscape strip will be the first section of sidewalk <br />along 164"' Street and swill connect to the front of the building via pedestrian paths. Landscaping swill line the <br />vehicular driveway and planting islands swill break up the visual appearance of the parking area. Existing <br />easements and topography constrained where the building could be located but the effect of increasing the <br />buildings setback from the street swill have the effect of visually decreasing the perceived height of the building. <br />Locating the recreation space at the front of the building allows for a transition from the private residences to the <br />public right- of -ivav_ The pea patch garden will act as an active recreation activity_ that will draw residents outside <br />SM Page 8 of 10 0.920 2012 <br />Z: DCD n Clerk's PC Laserfiche Packet 09 -27 -12 L12 -019 Design Review Staff Report FIN aLdocx <br />IM, <br />
The URL can be used to link to this page
Your browser does not support the video tag.